UNDERSTANDING PRODUCTION LINE INSTALLATION AND COMMISSIONING REQUIREMENTS

Understanding the intermittent bonded ribbon production line

Equipment for producing rollable formats in optical-fiber manufacturing is provided by Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. This setup is designed for 12- and 16-fiber ribbons, allowing buyers to compare its capacity against their planned product range. Factory space and installation needs may also be influenced by the system’s split-type construction.




The stated construction speed for this particular production line is 600 m/min. The process combines fiber pay-off, gathering and guiding, intermittent resin dispensing, UV-LED curing, visual monitoring, capstan pulling, and take-up. The full process is important to evaluate, not just the stated speed.

Before purchasing, check factory utilities, reel requirements, available floor space, and installation conditions. Request the supplier’s documentation package and confirm that the system matches your cable design and operating needs. Addressing these details in advance may limit setup delays and support a smoother start.

Key Takeaways

  • Designed for rollable 12- and 16-fiber formats.
  • Specified equipment speed: 600 m/min.
  • Features a split-type construction.
  • Includes curing, monitoring, pulling, and take-up stages.
  • Check utilities, reels, installation needs, and supplier documents before buying.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Explore The Intermittent Bonded Ribbon Production Line

To create rollable IBR formats, three mold groups position fibers for the application of small adhesive dots. Operators can adjust the mold position from 0 to 15 mm to maintain consistent spacing and shape.

Make Rollable Fiber Ribbons Using Precision Bonding

A 16-spool pay-off feeds the machine, while guide rollers with U-shaped grooves keep individual strands organized. Steady contact during processing is encouraged by the rollers’ hard-anodized surfaces. The adjustable valve arrangement supports 12F and 16F layouts, using 5+5+1 valves for 12 fibers or 5+5+5 for 16. Ask the supplier to verify tension control settings that suit your particular cable design.

Run 12- And 16-Fiber Configurations At Up To 600 m/min

The stated construction speed reaches 600 m/min. The listed reel dimensions, Φ236 mm × Φ25.4 mm × 108 mm and Φ267 mm × Φ25.4 mm × 180 mm, correspond to pay-off reel options holding 25.2 km or 50.4 km of fiber. T-type and fiber-optic take-up reels are also offered for this system. Assess whether reel capacity suits your operating needs and anticipated changeover time.

Review The Production Line’s Key Equipment And Controls

Consistent output depends on aligning tension, resin placement, and UV exposure. Operators can use the system to match settings with the needs of their cable design and fiber ribbon.

Coordinate Fiber Tension, Resin Dispensing, And UV-LED Curing

Every pay-off unit uses electro-pneumatic adjustment. Through the interface, operators set adhesive-dot spacing and counts while dispensers operate individually or in linked groups.

Three pre-curing ovens support the mold groups ahead of UV-LED post-curing. Ask the supplier to confirm resin compatibility and the relevant operating conditions.

The Siemens PLC and touchscreen show lamp current and oven temperature, generate alarms, and support preset lengths. Before purchase, verify cabinet requirements and power supply needs.

Stage Specification Buyer check
Fiber tension Pay-off: 0.4 to 2 N, ±0.02 N; capstan: 50 to 500 g, ±5 g accuracy Match settings to cable needs
Resin dispensing Individually operated or linked units with adjustable adhesive-dot spacing and count Check interface configuration
UV-LED curing Three 800 W pre-curing ovens; one 6 kW post-curing oven; 395 nm ± 3 nm; at least 85% cure under stable, high-speed conditions Confirm resin compatibility
Monitoring Siemens S7-1200 or S7-1500 PLC; 10.4-inch touchscreen; live lamp current and oven temperature, alarms, preset lengths Verify cabinet and power supply requirements

Prepare Line Configuration, Installation, And Operating Conditions

Before the machine is delivered, set aside a dedicated operating area. An enclosed, clean, dry, draft-free space is needed for the optical fibre system. Keep the temperature from 15°C to 25°C, with humidity at or below 85%. These conditions help safeguard fiber equipment and maintain precision during operation.

With your facilities team, assess site utilities, available electrical capacity, cabinet space, and cable design. Nitrogen at 7 bar with 99.99% purity and compressed air at 6 bar are required for the system. The electrical supply must be three-phase, five-wire, and 380 V ±10%.

  • Reserve room for the cabinet, components, resin, and access to service parts. Before starting the line, check the temperature settings and tension control.
  • Plan around the specified reel dimensions of Φ410 mm × Φ50.8 mm × 391 mm. Reels of up to 30 kg can be supported by the take-up unit.
  • Account for the main power feed-in cable when planning the site. Connection cables and cable trays are not included with the equipment.

Before ordering, confirm the supply scope, reel types, and installation requirements. This assessment can reduce setup time and help prevent later delays. Ask the supplier to verify settings for your fiber and cable design, including lamp accuracy and operating conditions. A clear plan helps the production system begin operating more smoothly.

Request Pricing For A Ribbon Production Solution Tailored To Your Needs

At its stated speed of 600 m/min, this line can be assessed by manufacturers producing rollable 12- or 16-fiber formats. Share details of your fiber layout, output targets, cable requirements, reel preferences, and factory conditions to obtain a quotation.

Confirm that the proposed system includes the 16-spool pay-off, UV-LED curing arrangement, take-up capacity, and relevant options. Before ordering, review the included components, dispensing-head options, unit functions, and cable design.

The documentation list includes operating and maintenance manuals, a general layout drawing, electrical schematics, and a wear-parts list. Reviewing these documents can clarify setup time and future service requirements.

For pricing and configuration details matched to your production plan and site utilities, contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. Verify the supply scope and replacement parts before purchase.